All 20 solutions

System 03 · Preconstruction

Specification & Scope Review

Turn massive construction documents into an actionable fireproofing scope.

Reviews specifications, drawings, addenda, and supporting documents for the technical requirements your estimate must capture.

The operational problem

Why this system exists.

Fireproofing scope is scattered across specification divisions, architectural and structural sheets, schedules, details, UL references, addenda, and general notes. Manual review is slow and inconsistent, especially under bid pressure. A single overlooked substrate condition, thickness change, testing requirement, or excluded area can become an expensive estimating error.

What you are buying

A functioning operating system—not a prompt, chatbot, or generic workflow.

The system ingests the complete bid package and produces a fireproofing-specific scope brief. It locates relevant sections, extracts requirements, ties each finding back to the source document and page, and separates confirmed scope from ambiguity requiring estimator review. The output is designed to accelerate expert judgment—not pretend the documents require no expert.

BUILT FOR

Contractors pricing large document sets where one missed assembly, thickness, product, test, or closeout requirement can erase job margin.

How it works

From raw project information to controlled action.

The exact integration changes by contractor. The operating sequence and accountability do not.

01

Ingest the package

Organize specifications, drawings, schedules, addenda, alternates, and referenced technical documents.

02

Locate fireproofing scope

Search for SFRM, intumescent, firestopping, UL assembly, thickness, substrate, testing, and closeout requirements.

03

Structure the findings

Create a scope matrix by area, assembly, material, rating, thickness, product, and document reference.

04

Escalate ambiguity

Flag conflicts, missing information, and unusual requirements for estimator decision or RFI.

System inputs

What it monitors and reads.

Project specificationsArchitectural drawingsStructural drawingsSchedules and detailsUL design referencesAddenda and alternates

Operational deliverables

What your team actually receives.

Fireproofing scope briefRequirement matrixSource-linked findingsExclusion and ambiguity listRFI candidatesEstimator review checklist

Business outcome

Faster preconstruction review and reduced risk of overlooking important scope requirements.

Performance is measured

This implementation is managed against operating indicators—not whether the automation merely runs.

  • Review hours per project
  • Scope items captured
  • Pre-bid clarifications raised
  • Missed-scope reduction

Commercial structure

$20,000 implementation. $3,500/mo ongoing management.

Implementation covers discovery, system architecture, configuration, integration, testing, controlled rollout, and team adoption for the agreed scope. Ongoing management covers monitoring, exception handling, optimization, reporting, and operational support.

Start with the $10,000 assessment

$10,000 operations assessment

Find the most expensive gap first.

We analyze your current operation, quantify revenue leakage and administrative drag, then build a custom implementation roadmap. The assessment fee may be credited toward a larger implementation.

See the assessmentNo generic AI pitch. We start with the costliest operational problem.